Financing

We have received donations to the building fund which were used to pay for the land. To take us to the second stage of financing, we are requesting for your support in cash and kind. The details of the contribution program are provided below:

Proposed Trinity Towers for RCCG City of David Victoria Island Annex, Oniru, Lekki, Lagos.
Preliminary Cost Estimate Breakdown

Pile foundation & sheet pile works    N700 M. 
Basement substructure (up to ground flr. level)   N1,500 M.
Steel/R.C frame and walls up to roof level   N1,360 M. 
Steel/R.C upper floors to roof level   N960 M.
Staircases from basement to roof level   N195 M.
Curtain walling & windows   N650 M. 
Doors and Fittings   N30 M.
Floors, walls & ceiling finishes   N430 M.
Electrical & plumbing installations   N350 M.
Lift installations    N325 M.
Central Air-Conditioning System    N1,000 M.
Generators and panels   N145 M.
Grand Preliminary Total Estimate  = N7,645 M.